Victoria Street Bridge suspended scaffold
CGE Hire were employed to install a scaffold suitable to inspect sections of this Victorian road bridge structure and carry out light repairs.
The ALLROUND working platforms are accessed via a full length scaffold walkway suspended from the bridge superstructure. Layher ALLROUND’s ability to cantilever gave simple access to the outside of the kerb wherever required and allowed the scaffolders to build down to the pier caps quickly and safely.
Thank you to John Onley and Andy Mason for use of these photos.