Mobile bridge access scaffold for blast and paint works
This solution is a fine example of what can be achieved with the broader range of Layher components. Due to tight dimensional constraints, and bridge loading, this ingenious solution was made possible by developing a mobile solution.
Both internal and external scaffolds move independently of each other, and was achieved by utilising:
- Aluminium Allround
- Steel Allround
- 12kN castors with fixing device
- Twin wedge couplers
- 2.57m ladder hatches
- 4.14m U steel lattice beams
- Spigot for U lattice beams
- Spigot with half coupler
- Clampable rosettes
- Clampable rosettes with thread
- Lock against lift off
- Rigid wedge couplers
- 450mm aluminium lattice beams
- 750mm aluminium lattice beams
- Tri-lite beams
- Aluminium platforms stairs
- Keder roof
Relocation of the 17t scaffold structure is completed in only 1 day. Supplied and installed by Alphasafe to carry out essential blast and paint, and repair works to an infrastructure road bridge in the New South Wales Hunter Region.