Craneable Allround Scaffold
Linkforce Engineering were engaged to undertake a double car dumper shutdown, this encompassed all rolling rails to be replaced along with trunion sets and spill faces. Read more
Linkforce Engineering were engaged to undertake a double car dumper shutdown, this encompassed all rolling rails to be replaced along with trunion sets and spill faces. Read more
These pylons support a conveyor belt going over a kilometre out to sea to deliver salt to waiting ships. This hanging scaffold is suspended off doubled up aluminium beams and cantilevered out around the base. Read more
The Defqon.1 September 2012 Music Festival lit up the Sydney International Regatta Centre for the fourth year running. As the gates opened, cheers erupted from the thousands who’d been waiting patiently in anticipation to see what the tightly held secret Main Stage would be. Read more
A facility for carrying out the blasting and painting of ship modules was required for a major project being undertaken by ASC in Adelaide. Layher’s Steel Cassette Roof, Protect panels and ALLROUND were combined to create a large encapsulated work area in the fraction of the time required for a permanent structure. Read more
Statewide Staging Systems was showing off its new Layher stage, stand and lighting towers, (dubbed ‘The Festival Gardens’), at the 2012 Perth International Arts Festival earlier this year. The festival ran for 22 nights with some of the best Australian and international acts performing on the Main Stage which consisted of Layher Allround and Layher EV 104 stage decks. Read more
CGE Hire were employed to install a scaffold suitable to inspect sections of this Victorian road bridge structure and carry out light repairs. Read more
Linkforce recently supplied this access for remedial works to ROM beam dampers. Traditionally scaffold was stick built in these situations, exposing workers to heights issues, meaning intricate fall prevention systems needed to be set up. Read more
Five Australian cities recently hosted the Nitro Circus. To perform the impressive aerial manoeuvres on BMX and Motocross bikes they required an equally impressive Jump. Read more
A coal loader at the Port Waratah Coal Services Terminal recently underwent an outage for painting and repairs. Layher Allround scaffolding was used for the top boom cantilever, underside catch platform as well as this independently hung scaffold which allowed the chute for the loader to be removed and lowered to a barge below. Read more
The 100m free-span roof truss of the new WIN Stadium Grandstand in Wollongong had to be rectified. Above Scaffolding designed this propping solution incorporating Layher Allround heavy duty base jacks and collars, to support the truss during removal and replacement. Read more
Alphasafe has been the sole scaffold contractor on site to Metso paper during construction of the Amcor B9 project. This pipe bridge scaffold was over 120 meters long and provided vital connections for services between the old and new mill. Read more
The iconic Fleet Steps at Mrs Macquarie’s chair on spectacular Sydney Harbour was recently transformed into an ambitious 3,000 seat open air venue for Opera Australia’s production of La Traviata. Read more