Footscray footbridge
The Allround bridging system has been used to create two 18m long pedestrian walkways over rail lines in Melbourne. The pre-assembled bridges were elevated into the exact positions using a crane. Read more
The Allround bridging system has been used to create two 18m long pedestrian walkways over rail lines in Melbourne. The pre-assembled bridges were elevated into the exact positions using a crane. Read more
Fulton Hogan needed heavy duty propping to build a shared use pathway over the Maroondah Highway, Ringwood, Victoria. John Onley, CGE Hire MD said, “we used six Layher Allround heavy duty propping towers to support a total of eight deck sections weighing from 27t to 38t each. Read more
CGE have completed this impressive airfield control tower scaffold, taking cantilevers to a new level! The project involved attaching Layher ALLROUND to a concrete wall, then creating 5 lifts of cantilevered working platforms to allow for the construction of the control tower. Read more
The ALLROUND bridging system has been used to create two 18m long pedestrian walkways over rail lines in Melbourne. The pre-assembled bridges were elevated into the exact positions using a crane. Read more
CGE Hire were employed to install a scaffold suitable to inspect sections of this Victorian road bridge structure and carry out light repairs. Read more
CGE Hire was engaged by one of the country’s largest infrastructure projects for the design and supply of this suspended Layher Allround stair solution. The main scaffold stair tower was erected by CGE Hire in-situ. Read more