
The FW System bridges the gap
The replacement of cladding on substantial plant enclosures is usually a simple process. However, in this case adjacent plant structures at a lower level required a bridged solution. Integral Scaffolding took up the challenge. Working closely with Layher’s technical team, a 18m truss was designed using Layher’s FW System. Read more