Coal services terminal scaffolding
A coal loader at the Port Waratah Coal Services Terminal recently underwent an outage for painting and repairs. Layher Allround scaffolding was used for the top boom cantilever, underside catch platform as well as this independently hung scaffold which allowed the chute for the loader to be removed and lowered to a barge below. Read more