Celebrating 20 years in Australia
2022 has been a year to remember, with a surge in demand across all scaffolding markets. Read more
2022 has been a year to remember, with a surge in demand across all scaffolding markets. Read more
Presented by Federation Square in Melbourne, the Art After Dark festival included the Constellations audio-visual installation by the artist Joanie Lemercier. Projecting light through water particles, he created a mesmerising display that he had never before presented in Australia. Read more
In 1927, the 60 year project to construct St Ignatius Church in Richmond came to a conclusion. This is the first refurbishment work to be conducted on the spire of this fine heritage building, and it was no surprise to see Scaff-Co awarded with the scaffolding contract. Read more
APS successfully secured this project to provide a 13.5m, 5kPa temporary footbridge in support of the major programme presently underway in Melbourne to remove railway level crossings. Read more
As part of Melbourne’s level crossing removal programme, Stilcon Scaffolding successfully secured the Glenroy Railway Station contract to provide public access stairways, and a 2.57m wide overpass spanning 16.5m between the platforms. Read more
Insta Group have recently undertaken a series of repair and refurbishment projects in Victoria where a versatile approach was a prerequisite. Insta Group’s use of their Layher Allround scaffolding certainly met this requirement. Working closely with Insta Group, Layher’s technical team produced a design to overcome the challenges presented by the circular shape of this lighthouse. Read more
Granted Access welcomed the technical challenges presented by this project. The requirement was to provide access to enable finishing works, waterproofing and balustrade installation. The Granted Access solution was imaginative, and met all their client’s technical specifications. Read more
Granted Access was awarded the contract to provide access solutions to overcome complex problems for the repair and refurbishment of this landmark heritage building. This was no surprise, because Granted Access has a well-earned reputation for successfully undertaking difficult projects in this sector. Read more
APS Industrial Services using the Layher Allround scaffolding system to provide very effective access for blasting and painting operations. Read more
Installed by All Systems Scaffolding in South Melbourne, the versatility, efficiency and built-in safety features of the Layher Allround scaffolding system delivered another astonishing project. Read more
The unique capabilities of Layher’s Allround System have delivered another outstanding solution. Scaff-Co Pty Ltd were appointed to design and install a craneable scaffold stairway tower and working platform to provide access for the maintenance work atop the dome at the St Mary’s church in Bairnsdale, Victoria. Read more
The Allround bridging system has been used to create two 18m long pedestrian walkways over rail lines in Melbourne. The pre-assembled bridges were elevated into the exact positions using a crane. Read more